COMMENT

By The
HIGH ROCK LAKE ASSOCIATION, INC.

Submitted To
UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION

Docket # P-2197-060
Applicant:  Alcoa Power Generating Company, Inc.
Name of Project:  Yadkin
 Comment Date: March 3, 2003

The High Rock Lake Association (HRLA) is submitting this Comment to the Federal Energy Regulatory Commission (FERC) pursuant to FERC Notice dated February 26, 2003. The High Rock Lake Association has represented the users of High Rock Lake for 49 years. The subject of this Comment is a document submitted by Alcoa Power Generating Inc. (Alcoa) and represented by Alcoa as being submitted in response to FERC’s December 20, 2003 order.

HRLA is requesting FERC deny approval of this document, titled Drought Contingency Plan (the Plan). In a cover letter dated February 14, 2003 Alcoa’s Counsel asks FERC that the Plan “be approved as being in compliance with the December 20th Letter”.   HRLA contends “the Plan” as submitted is non-responsive to FERC’s December 20, 2002 order, it is deceptively titled, and it serves little, if any, practical purpose.

 The HRLA filed a comment with the Commission (FERC) on February 10, 2003 indicating our concerns with a “draft” Operation Plan for High Rock Lake prepared by Alcoa.  We are now especially disturbed that Alcoa (“the Licensee”) submitted its official “Plan” to FERC on February 14, 2003 in a form essentially unchanged from its draft form, and non-responsive to most input from the North Carolina Department of Environmental and Natural Resources (“NCDENR”) and others.  We ask that you consider our comments and specific information on the following issues:

1. FERC’s December 20, 2002 contained specific demands to Alcoa Power Generating Inc. (“Alcoa”)
2. Alcoa’s submission on February 14 is NON-RESPONSIVE to FERC’s demands.
3. An Operation Plan for High Rock Lake is Necessary
4. Drought definition and recognition should not be the primary factor controlling lake operation.
5. Alcoa’s Claimed “Financial Sacrifices”
6. HRLA Request For Action By The Federal Energy Regulatory Commission

Following we expand on the above issues, and make specific recommendations to FERC for the operation of High Rock Lake during 2003 and subsequent years pending establishment of new license terms in 2008.

1. FERC’S DECEMBER 20, 2002 ORDER CONTAINED SPECIFIC DEMANDS TO ALCOA POWER GENERATING INC. (“ALCOA”)

Mr. Joseph D. Morgan’s letter of December 20, 2002 to Alcoa directed Alcoa to submit a plan of operation for the year 2003 that would ensure the elevation of High Rock Lake is maintained within five (5) feet of full pond.   FERC’s December 20, 2003 Letter contained the following dictates and requirements:

a) Proceedings under Docket # P-2197-056 are concluded; and any temporary modified operating Protocols are to be similarly concluded.
b) All requests for future deviation from reservoir operating requirements are denied.
c) Project P-2197 is to resume operation in accordance with its License terms.
d) Develop a Contingency Drought Operating Plan. The Plan was to include at least the following points:

i. Means of achieving a principle goal of ensuring the elevation of High Rock Lake is maintained within five feet of full pool”.
ii. Alternate Management Practices
iii. Early Reduction in Discharges
iv. An Implementation Schedule

e) File the Contingency Drought Operating Plan by February 15, 2003.
f) Provide data that would show if there was any salt water intrusion at the Grand Strand during periods of target flow of 900 cfs at the Rockingham stream flow gage.
g) Provide data to indicate what minimum flow is needed from Project P-2197 to prevent salt water intrusion at Grand Strand.

2. ALCOA’S SUBMISSION ON FEBRUARY 14 IS NON-RESPONSIVE TO FERC’S DECEMBER 20, 2003 LETTER.

The HRLA is extremely concerned that the “plan” submitted February 14, 2003 completely ignores the principle goal defined by Mr. Morgan’s letter; i.e., ensure the elevation of High Rock Lake is maintained within five feet of full pond.

Specifically, a review of Alcoa’s Drought Contingency Plan with respect to the points required by FERC in Section 1 shows the following:

1.a) Alcoa does not acknowledge the Temporary Protocol 2002 is canceled
1.b) Alcoa does not acknowledge requests for future deviation from reservoir operating requirements are denied
1.c) Alcoa does not confirm Project P-2197 is to resume operation in accordance with its License terms.
1.d) Alcoa’s plan is totally devoid of the specific points required by FERC
1.e) Alcoa has failed to file a “Contingency Drought Operating Plan” by February 15, 2003; in that the document it submitted is absent the operating parameters required by FERC.
1.f) Alcoa did not provide any data that does or does not support allegations of saltwater intrusion at Grand Strand. 
1.g) Alcoa did not provide any studies that do or do not support any specific discharge from P-2197 to prevent salt water intrusion at Grand Strand.

 The “Drought Contingency Plan” that Alcoa has submitted is not a plan as was ordered by FERC; it is more of a discussion of issues raised during the past year.   Incredulously, on a footnote on Page 5, Alcoa states it does not understand Mr. Morgan’s letter.  That footnote speaks volumes about Alcoa’s attitude towards public concern over the way it has operated High Rock Lake in the past. HRLA finds no difficulty understanding a clear instruction to ensure the elevation of High Rock Lake is maintained within five feet of full pond.  Further, if Alcoa did not understand the letter, why did it wait until February 14, 2003 to tell FERC, when Mr. Morgan’s December 20 letter volunteered FERC staff to assist Alcoa with preparation of a Plan?

3. AN OPERATION PLAN FOR HIGH ROCK LAKE

FERC has requested a Plan of Operation, and Alcoa should have been responsive to that plan.

Since Alcoa now says it does not understand the Directors instructions, we think FERC staff should prepare a plan for Alcoa for 2003 through the term of its license ending April 2008.

The High Rock Lake Association believes FERC should immediately mandate the operation of High Rock Lake to be changed to Run-of-River mode.  Such a plan would allow:

Operation in Run-of-River Mode would provide numerous benefits to those who rely upon the Yadkin River, High Rock Lake, and the Pee Dee River. Consider the following:

HRLA is sure that Alcoa will vehemently object to being told to operate High Rock Lake in a Run-of-River mode, claiming the frequent “SPILLS” that would occur.  FERC should consider the following when dealing with this argument:

We conclude there is no appreciable penalty to Alcoa for operating in a Run-of-River mode, certainly not enough to offset the immeasurable damage it causes by its current operational practices.

4. DROUGHT DEFINITION AND RECOGNITION SHOULD NOT BE THE PRIMARY FACTOR CONTROLLING LAKE OPERATION.

Within a month of receiving FERC’s December 20, 2003 letter, Alcoa had operated its hydro power facilities at High Rock dam at such a high level of power production that it had pulled High Rock Lake to approximately 11½ feet below full pond.  That seems to be in direct disregard for the Commissions instructions, and is indicative of Alcoa’s pattern of violating terms of its FERC license.

FERC specifically instructed Alcoa that it “should ensure High Rock reservoir is within five feet of full by May 15, 2003 through September 15, 2003”.  Alcoa has gambled upon ample rainfall to achieve compliance with its FERC License terms. Such a gamble seems to indicate Alcoa has little concern for the mandate from FERC; and such gambling clearly shows no concern for the environmental, recreational, economic, and social impacts that low water levels have upon the communities around High Rock Lake.

Without depending upon unknown rainfall events, the only way Alcoa can absolutely ensure compliance with FERC’s directive is to limit drawdown to 5 feet below full between September 15 and May 15, and maintain lake levels described by their FERC license during the May 15 – September 15 period. Please note, the license terms show a “curve” for summer lake operation, and in early July the lake should be no lower than 2½ feet below full pond.  Alcoa could then use any rainfall event and high river inflows for additional generating capacity, while being certain it is able to guarantee its lake levels. 

Alcoa has been consistent and steadfast in their claim that draining of High Rock Lake in June and July of 2002 was caused by a combination of the drought and the terms of Alcoa’s Federal License.  If that is the case, the license is flawed, and there clearly must be action by both Alcoa and FERC to prevent a recurrence of the disastrous draining of High Rock Lake.

We must remember that 2002 is not the only year considered as a drought year. According to official USGS records for the Yadkin River at Yadkin College, average mean daily flow was actually higher in 2002 than flow in 2001. Although High Rock Lake experienced low lake levels in 2001 it was nothing approaching the draining of the lake in 2002.

We also note that the logistics of drought recognition and reaction, as evidenced in the summer of 2002; in conjunction with the relatively slow movement of state and federal agencies (who are bound by regulatory procedures) do not allow swift reactions to rapidity deteriorating lake conditions. We believe Mr. Morgan recognized this problem when he issued the December 20, 2002 letter.

5. ALCOA’S CLAIMED “FINANCIAL SACRIFICES”

Alcoa makes many claims of financial sacrifice when it is called upon to justify its operation of High Rock Lake.  The High Rock Lake Association believes Alcoa should either make a public release of its operating revenues from High Rock Lake and detail information concerning its alleged sacrifices, or it should refrain from using such statements to sway public opinion. Consider the following excerpt from a recent Alcoa webpage:

During this recent precipitation, APGI generated power and released as much water as possible through its generators but High Rock Reservoir still rose from 8 feet below full pool at midnight on February 21, 2003 to its present level, as noted in the table, below. Flood gates at High Rock Dam were opened at about noon on February 24 to handle additional streamflow, resulting in lost power generation. APGI anticipates spilling through February 26.

In the above, and other similar statements, Alcoa portrays a “financial loss” because it has SPILLED river water.  This statement indicates Alcoa believes it OWNS the water that flows in the Yadkin River, and unless every drop flows thru its generators it professes to have incurred a financial loss. 

The High Rock Lake Association believes the water in the Yadkin River is for everyone, and is not owned by Alcoa. HRLA also believes Alcoa should show equal concern for every individual and business that suffers financially when Alcoa drops lake levels below the level required by its FERC License.

HRLA does not have the access to current Alcoa electrical production data, but from the 2001 FERC Form No. 1 we noted that Alcoa’s electricity generating revenues were 127% of Year 2000 revenues. That level of power production was obtained with average river flow at 20% less than in 2000.  We believe there is a direct correlation between increased revenues and decreased lake levels, indicating a Water Resource Management Issue, not a Drought Issue.

6. REQUEST FOR ACTIONS BY    THE FEDERAL ENERGY REGULATORY COMMISSION

The High Rock Lake Association expects FERC to reject Alcoa’s submission of February 14, 2003 for the reasons stated herein.  The Public has the right to expect a clear and non-ambiguous Lake Management Plan that provides straightforward answers to the points raised in FERC’s December 20, 2002 order; and on which provides guidelines to Alcoa’s operations staff that are not subject to whimsical interpretations.  Alcoa must not be permitted to continue operation of High Rock Lake under terms that caused or may have contributed to the 2002 Summer disaster.

The HRLA is requesting immediate action from the Federal Energy Regulatory Commission (FERC) to implement strict and immediate oversight for the operation of High Rock Lake. We believe FERC’s intervention is necessary to protect High Rock Lake from a repeat of last summers devastating mismanagement of the lake.  FERC must act to prevent further devastation, to protect the environment, fish and wildlife, protect recreational opportunities upon our lake, and protect stream flow conditions in the Yadkin- Pee Dee River.  FERC must move to direct operation of High Rock Lake in a fashion that will refill the lake and maintain a full lake.  In view of Alcoa’s past failure to abide by its own approved operating guidelines, we ask that for the remaining period of the present License that FERC direct Alcoa to operate High Rock Lake as a Run-of-River facility, just like the other three (3) project lakes.

FERC must recognize a fundamental difference exists in the operation of the Project.  The hydropower facilities are no longer operated to provide beneficial employment to workers at Alcoa’s Badin Works.  Available information indicates Alcoa is now selling all power produced to Aquilla Energy Management Co. (AEMC) for commercial utility grid distribution.  We think it is not just coincidence that drastically lower Project lake levels have accompanied the AEMC agreement.

The Summer of 2002 was disastrous for High Rock Lake, and to all who depend upon the lake for many varied purposes. We know current law requires your Commission to consider issues other than simply power production; and we expect FERC actions to address lake operational problems immediately to avoid a repeat of last summer.

Remember, after receipt of FERC’s December 20, 2002 letter, Alcoa was quoted by local newspapers as saying “Its just business as usual”.  FERC must not allow or condone “Business as usual”.

Respectfully Submitted,

HIGH ROCK LAKE ASSOCIATION

Larry O. Jones, President

HIGH ROCK LAKE ASSOCIATION
PO Box 159                                   Telephone (704) 633-8799
Southmont, NC  27351                 E-Mail:  larry@foxhollowfarm.org

              

CERTIFICATE OF SERVICE

I certify that I have this 3rd  day of March 2003 served this Comment via U.S. Mail upon all persons on the service list maintained by the Federal Energy Regulatory Commission for Project No 2197.

Respectfully submitted,

Larry O. Jones